Central Wastewater Treatment Plant in the Municipality of Cerknica
Supply, assembly, commissioning of electro- mechanical equipment and trial operation
WWP: 12.000 PE
Area
Environmental Protection
Category
Wastewater treatment
Year
2014
Location
Slovenia
Client
Občina Cerknica

Partner with us

Andrej Ivanc
Head of Environmental Protection
T: + 386 (0) 1 58 16 330
E: E: andrej.ivanc@riko.si