Riko Riko
search

Construction of Solar Power Plants at Warehouse 50 and Warehouse 51 fr Luka Koper, the Port of Koper

Construction, supply, and installation of a photovoltaic power plant.

Area

Energy

Category

Renewable energy

Year

2024

Location

Slovenija

Client

Luka Koper

Partner with us

M_G
Matjaž Goltes

Head of the Energy Sector

T: + 386 (0) 1 58 16 338

E: matjaz.goltes@riko.si