Construction of the sewerage and water supply system
Sewerage network:
Construction of the Sewerage system in the total length of 10,83 km with one pumping station, including civil works, procurement and installation of mechanical, electrical, instrumentation and control equipment, start-up, training of personnel and commissioning.
Water supply network:
Construction of the water supply force main in the length of 2,66 km from the PS Brvenica to the WPP Beoci (up to the connection to the existing pipeline, immediately in front of the WPP) including the accompanying facilities.
Area
Environmental Protection
Category
Municipal Infrastructure
Year
2018
Location
Serbia
Client
Ministry of Finance, Republic of Serbia





Noteworthy
In the municipality of Raška (Republic of Serbia), the company RIKO completed the construction of a 10.83 km long sewage network with one pumping station and a 2.66 km pipeline from the Brvenica pumping station to the junction with the existing pipeline, directly in front of the Beoci wastewater treatment plant, within two years.