Design, delivery and installation of the wastewater treatment plant and pumping station in the city of Zhytomyr
The project is a turnkey construction project comprisng the design, delivery and installation of the plant. The daily design capacity of the plant is 75,000 m³ and the plant will supply drinking water to about 250,000 inhabitants of the city of Zhyitomyr.
Area
Environmental Protection
Category
Wastewater treatment
Year
2018
Location
Ukraine
Client
Utility Company “Zhytomyrvodokanal”






Partner with us

Andrej Ivanc
Head of Environmental Protection
T: + 386 (0) 1 58 16 330
E: E: andrej.ivanc@riko.si