Upgrading of main railway line No. 20 Ljubljana – Jesenice – D.M. at Podnart – Lesce Bled

Upgrading the railway line in accordance with European standards in a length of 10.69 km, replacement of the track superstructure, renovation of the track substructure, construction of the track drainage system, installation of railway track cables, renovation of the platform infrastructure at the Otoče, Globoko and Radovljica railway stations, rehabilitation of the Globoko and Radovljica tunnels, rehabilitation of supporting and reinforcing walls and additional reinforcement of banks with gabions, replacement of overhead contact lines and load-carrying structures, rehabilitation of old water trenches and bridging structures, construction of level crossings, connecting roads and multilevel intersections in the area of Podnart, Zaloš, Vrba and Žirovnica, implementation of noise abatement measures.

Area

Transport Infrastructure

Category

Railway infrastructure

Year

2020-2022

Location

Slovenia

Client

Slovenian Infrastructure Agency

Partner with us

Urban_Jaklic
Urban Jaklič

Head of Transport Infrastructure

T: + 386 (0) 1 58 16 322

E: urban.jaklic@riko.si