Wastewater treatment plant
Construction and trial operation of a WWTP, construction of a sewage system with pumping stations and retention basins.
Capacity
WWP: 20.000 PE
Sewerage: 14,6 km
Area
Environmental Protection
Category
Wastewater treatment
Year
2015
Location
Slovenia
Client
Municipality of Grosuplje








Partner with us

Andrej Ivanc
Head of Environmental Protection
T: + 386 (0) 1 58 16 330
E: E: andrej.ivanc@riko.si